Website error
To report an error, select a text fragment containing the error that is between 3 and 20 characters long...

Error in the word - ЕУЫЕ

Enter the correct option

ico
ico ico ico
Color scheme:
A A A
Size:
A A A A A
sound Sound accompaniment
The site contains sound. To listen to the text, you need to select it with the mouse and click on the icon that appears.

Processing of technogenic waste accumulated at the Kuytosh tungsten mine tailings storage facility, and the reconstruction and modernization of existing buildings and structures at auxiliary facilities.

 Processing of technogenic waste accumulated at the Kuytosh tungsten mine tailings storage facility, and the reconstruction and modernization of existing buildings and structures at auxiliary facilities. 16.07.2026
Processing of technogenic waste accumulated at the Kuytosh tungsten mine tailings storage facility, and the reconstruction and modernization of existing buildings and structures at auxiliary facilities.

Announcement
A tender is announced for commercial proposals to develop a working design for the processing of technogenic waste accumulated at the Kuytosh tungsten mine's tailings storage facility, as well as for the reconstruction and modernization of the mine's main and auxiliary buildings and structures!

Annual capacity: Extraction and processing of 300,000 tons of technogenic waste

Completion period: 4 months

Key works to be performed:

1. Preparation of tailings for re-processing and design for the modernization of the processing plant (gravity, flotation, and magnetic separation sections);

2. Modernization of the warehouse facility, including systems for concentrate drying, additional crushing, and loading;

3. Design of infrastructure, water supply, automated metering systems (ASKUE), automated process control systems (ASU TP), and fire safety systems;

4. Development of environmental protection sections (including the Environmental Impact Assessment/ZEP project and expert review support) and industrial safety sections;

5. Preparation of cost estimates using the resource method at current prices and the Construction Organization Project (QTL).

Requirement: Relevant license and experience in the mining and mineral processing sector.
 

 

Please submit your commercial proposal in its original form to the email address info@uztmk.uz or via the established procedure.

  • ico
    Processing of technogenic waste accumulated at the Kuytosh tungsten mine tailings storage facility, and the reconstruction and modernization of existing buildings and structures at auxiliary facilities.
    13.08.2026
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”
29.07.2026
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”
Power supply for Site No. 1 of the geotechnological facility for ammonium perrhenate production, located in the Tomdi District of the Navoi Region.
Power supply for Site No. 1 of the geotechnological facility for ammonium perrhenate production, located in the Tomdi District of the Navoi Region.
23.07.2026
Power supply for Site No. 1 of the geotechnological facility for ammonium perrhenate production, located in the Tomdi District of the Navoi Region.
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Nurabad District, Samarkand Region.”
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Nurabad District, Samarkand Region.”
29.07.2026
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Nurabad District, Samarkand Region.”

Our partners

Useful links

Rate the website
Successfully sent
ico
Your participation helps us become even better. We are delighted to have you with us.
You have already submitted your rating
Please try again in a few days