Website error
To report an error, select a text fragment containing the error that is between 3 and 20 characters long...

Error in the word - ЕУЫЕ

Enter the correct option

ico
ico ico ico
Color scheme:
A A A
Size:
A A A A A
sound Sound accompaniment
The site contains sound. To listen to the text, you need to select it with the mouse and click on the icon that appears.

ANNOUNCEMENT

 ANNOUNCEMENT 25.03.2026
ANNOUNCEMENT

АО "Узбекистон ТМК" приглашает на работу опытного Директора по строительству (Head of Construction) для реализации крупных инвестиционных и промышленных проектов.


Основные обязанности:


• Управление строительными проектами по модели EPC
• Координация инжиниринговых процессов
• Контроль деятельности подрядчиков и проектной команды
• Обеспечение соблюдения сроков строительства, бюджета и показателей качества
• Управление процессами пусконаладки и сдачи-приёмки объекта
• Ведение технической и операционной отчётности


Требования к кандидату:


• Опыт работы в крупных промышленных или инвестиционных проектах
• Практический опыт в управлении строительством и EPC-контрактами
• Выраженные управленческие и лидерские качества
• Опыт работы с международными командами
• Знание русского и английского языков будет преимуществом


Коммерческие предложения необходимо направлять Заказчику по электронной почте info@uztmk.uz или в бумажном виде (в установленном порядке).

Tungsten mine and processing plant project in Sarikuly, turnkey (design, procurement, installation, and construction – EPC)
Tungsten mine and processing plant project in Sarikuly, turnkey (design, procurement, installation, and construction – EPC)
09.09.2026
Tungsten mine and processing plant project in Sarikuly, turnkey (design, procurement, installation, and construction – EPC)
Conducting a technical audit of the technological process in the hydrometallurgical workshops for the production of molybdenum and tungsten semi-products of the Rare Metals and Hard Alloys Production Plant.
Conducting a technical audit of the technological process in the hydrometallurgical workshops for the production of molybdenum and tungsten semi-products of the Rare Metals and Hard Alloys Production Plant.
25.08.2026
Conducting a technical audit of the technological process in the hydrometallurgical workshops for the production of molybdenum and tungsten semi-products of the Rare Metals and Hard Alloys Production Plant.
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”
29.07.2026
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”

Our partners

Useful links

Rate the website
Successfully sent
ico
Your participation helps us become even better. We are delighted to have you with us.
You have already submitted your rating
Please try again in a few days