Website error
To report an error, select a text fragment containing the error that is between 3 and 20 characters long...

Error in the word - ЕУЫЕ

Enter the correct option

ico
ico ico ico
Color scheme:
A A A
Size:
A A A A A
sound Sound accompaniment
The site contains sound. To listen to the text, you need to select it with the mouse and click on the icon that appears.

Commercial Proposal – MISKON Testing-266

 Commercial Proposal – MISKON Testing-266 25.05.2026
Commercial Proposal – MISKON Testing-266

JSC UzTMK presents its compliments to your company and invites you to participate in the competitive selection process for the preparation of a factual review-level report to support decision-making on the necessity of further sample testing activities at the Miskon deposit.

The scope of work includes:

  1. Testing of ore beneficiation samples;
  2. Review and analysis of all available data;
  3. Conducting a comprehensive program of metallurgical laboratory investigations of the deposit ores;
  4. Preparation of a transparent and well-substantiated factual report containing clear recommendations for the next stages of investigation (e.g., additional drilling and/or metallurgical testing).

The proposal should include:

  • Project execution schedule;
  • Payment terms;
  • Proposal validity period (not less than 60 calendar days);
  • Description of relevant experience (particularly in tailings assessment and/or evaluation of low-grade materials).

In accordance with the Terms of Reference, we kindly request that you submit a technical and commercial proposal for the execution of the works specified therein.

All required information should be sent by email to info@uztmk.uz and sh.gulyamov@uztmk.uz.

Please indicate the following subject line in your email:

“Commercial Proposal – MISKON Testing-266”

The Terms of Reference are attached.

  • ico
    ТЕХНИЧЕСКОЕ ЗАДАНИЕ НА ПРОВЕДЕНИЕ НИР
    Test trials of beneficiation of a Cu+Au+Mo+Ag-bearing ore sample from the Miskon deposit
    08.06.2026
Tungsten mine and processing plant project in Sarikuly, turnkey (design, procurement, installation, and construction – EPC)
Tungsten mine and processing plant project in Sarikuly, turnkey (design, procurement, installation, and construction – EPC)
09.09.2026
Tungsten mine and processing plant project in Sarikuly, turnkey (design, procurement, installation, and construction – EPC)
Conducting a technical audit of the technological process in the hydrometallurgical workshops for the production of molybdenum and tungsten semi-products of the Rare Metals and Hard Alloys Production Plant.
Conducting a technical audit of the technological process in the hydrometallurgical workshops for the production of molybdenum and tungsten semi-products of the Rare Metals and Hard Alloys Production Plant.
25.08.2026
Conducting a technical audit of the technological process in the hydrometallurgical workshops for the production of molybdenum and tungsten semi-products of the Rare Metals and Hard Alloys Production Plant.
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”
29.07.2026
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”

Our partners

Useful links

Rate the website
Successfully sent
ico
Your participation helps us become even better. We are delighted to have you with us.
You have already submitted your rating
Please try again in a few days