Website error
To report an error, select a text fragment containing the error that is between 3 and 20 characters long...

Error in the word - ЕУЫЕ

Enter the correct option

ico
ico ico ico
Color scheme:
A A A
Size:
A A A A A
sound Sound accompaniment
The site contains sound. To listen to the text, you need to select it with the mouse and click on the icon that appears.

To Whom It May Concern

 To Whom It May Concern 04.06.2026
To Whom It May Concern

JSC “Uzbekistan Technological Metals Complex” (TMK) presents its compliments to your company and invites you to participate in the tender for sample preparation and laboratory analytical testing services aimed at determining the chemical composition of new samples obtained under the “Development of the Miskon Copper Porphyry Deposit” project.

When preparing your technical and commercial proposal, please take into consideration the following requirements:

  • Timeframe for completion of the work;
  • Payment terms;
  • Validity period of the proposal (not less than 60 calendar days);
  • Description of relevant experience and qualifications;
  • Compliance of the scope of work with the requirements set forth in the Terms of Reference;
  • Confirmation of compliance with all requirements specified in the Terms of Reference.

Should you be interested, we kindly request that you submit your technical and commercial proposal for the execution of the works in accordance with the attached Terms of Reference.

Please send all the above-mentioned information via email to info@uztmk.uz and sh.gulyamov@uztmk.uz, indicating “Laboratory Commercial Proposal, Miskon-845” in the subject line.

The Terms of Reference are attached herewith.

  • ico
    Technical Specification
    for sample preparation and laboratory analytical testing of core samples collected from the Miskon copper-porphyry deposit (Miskon-I and Miskon-II areas).
    04.06.2026
Tungsten mine and processing plant project in Sarikuly, turnkey (design, procurement, installation, and construction – EPC)
Tungsten mine and processing plant project in Sarikuly, turnkey (design, procurement, installation, and construction – EPC)
09.09.2026
Tungsten mine and processing plant project in Sarikuly, turnkey (design, procurement, installation, and construction – EPC)
Conducting a technical audit of the technological process in the hydrometallurgical workshops for the production of molybdenum and tungsten semi-products of the Rare Metals and Hard Alloys Production Plant.
Conducting a technical audit of the technological process in the hydrometallurgical workshops for the production of molybdenum and tungsten semi-products of the Rare Metals and Hard Alloys Production Plant.
25.08.2026
Conducting a technical audit of the technological process in the hydrometallurgical workshops for the production of molybdenum and tungsten semi-products of the Rare Metals and Hard Alloys Production Plant.
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”
29.07.2026
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”

Our partners

Useful links

Rate the website
Successfully sent
ico
Your participation helps us become even better. We are delighted to have you with us.
You have already submitted your rating
Please try again in a few days