Website error
To report an error, select a text fragment containing the error that is between 3 and 20 characters long...

Error in the word - ЕУЫЕ

Enter the correct option

ico
ico ico ico
Color scheme:
A A A
Size:
A A A A A
sound Sound accompaniment
The site contains sound. To listen to the text, you need to select it with the mouse and click on the icon that appears.

Topographic and geodetic survey works are planned to be carried out within the framework of the project “Preparation of the Miskon copper-porphyry deposit for industrial development” by JSC “Uzbekistan Technological Metals Combine.”

 Topographic and geodetic survey works are planned to be carried out within the framework of the project “Preparation of the Miskon copper-porphyry deposit for industrial development” by JSC “Uzbekistan Technological Metals Combine.” 25.06.2026
Topographic and geodetic survey works are planned to be carried out within the framework of the project “Preparation of the Miskon copper-porphyry deposit for industrial development” by JSC “Uzbekistan Technological Metals Combine.”

Topographic and geodetic survey works are planned as part of the project "Preparation for the industrial development of the Miskon copper-porphyry deposit" by "Uzbekistan Technological Metals Combine" JSC.

In this regard, we request that you submit your commercial proposals in accordance with the technical specifications, covering the execution of engineering-geodetic surveys using drones and accounting for the requirement of state registration/approval.

Note: To facilitate state registration, participants are required to submit permits for conducting geodetic works and for operating drones.

Commercial proposals must be submitted to the Client via email (info@uztmk.uz) or in hard copy (in accordance with official procedures).

  • ico
    Topographic and geodetic survey works are planned to be carried out within the framework of the project “Preparation of the Miskon copper-porphyry deposit for industrial development” by JSC “Uzbekistan Technological Metals Combine.”
    28.07.2026
Tungsten mine and processing plant project in Sarikuly, turnkey (design, procurement, installation, and construction – EPC)
Tungsten mine and processing plant project in Sarikuly, turnkey (design, procurement, installation, and construction – EPC)
09.09.2026
Tungsten mine and processing plant project in Sarikuly, turnkey (design, procurement, installation, and construction – EPC)
Conducting a technical audit of the technological process in the hydrometallurgical workshops for the production of molybdenum and tungsten semi-products of the Rare Metals and Hard Alloys Production Plant.
Conducting a technical audit of the technological process in the hydrometallurgical workshops for the production of molybdenum and tungsten semi-products of the Rare Metals and Hard Alloys Production Plant.
25.08.2026
Conducting a technical audit of the technological process in the hydrometallurgical workshops for the production of molybdenum and tungsten semi-products of the Rare Metals and Hard Alloys Production Plant.
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”
29.07.2026
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”

Our partners

Useful links

Rate the website
Successfully sent
ico
Your participation helps us become even better. We are delighted to have you with us.
You have already submitted your rating
Please try again in a few days