“Project for exploration (prospecting and detailed exploration) of tungsten and other mineral resources at the Eastern Sarykul Site, evaluation works at the Oqsoy Area, as well as exploration of the flanks and deep horizons of these areas.”
Main Scope of Work:
- Core drilling (HQ / 63.5 mm): 37 boreholes, total drilling volume — 7,550 meters (exploration drilling — 5,250 m; sterilization drilling — 2,300 m).
- Infrastructure preparation: construction of 37 drilling pads and 2,000 m of access roads.
- Geology and laboratory analysis: core logging and splitting, scheelite identification, QA/QC control, and multi-element chemical analysis using ICP-MS/OES methods.
Requirements:
- Availability of 8–12 crawler-mounted drilling rigs equipped with a KANAT (Wireline) system.
- Inclinometer measurements must be performed in each borehole.
- Execution period: from 2 to 4 months.
We kindly request that the original commercial proposal be submitted to info@uztmk.uz by email or in accordance with the established procedure.
-
“Project for exploration (prospecting and detailed exploration) of tungsten and other mineral resources at the Eastern Sarykul Site, evaluation works at the Oqsoy Area, as well as exploration of the flanks and deep horizons of these areas.”
12.08.2026
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”
29.07.2026
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Akhangaran District, Tashkent Region.”
Power supply for Site No. 1 of the geotechnological facility for ammonium perrhenate production, located in the Tomdi District of the Navoi Region.
23.07.2026
Power supply for Site No. 1 of the geotechnological facility for ammonium perrhenate production, located in the Tomdi District of the Navoi Region.
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Nurabad District, Samarkand Region.”
29.07.2026
In accordance with the Decree of the President of the Republic of Uzbekistan, regarding the implementation of the project “Construction of the ‘Future Metals’ Technopark in Nurabad District, Samarkand Region.”