Website error
To report an error, select a text fragment containing the error that is between 3 and 20 characters long...

Error in the word - ЕУЫЕ

Enter the correct option

ico
ico ico ico
Color scheme:
A A A
Size:
A A A A A
sound Sound accompaniment
The site contains sound. To listen to the text, you need to select it with the mouse and click on the icon that appears.

Commercial Proposal Nurlikon-962

 Commercial Proposal Nurlikon-962 25.05.2026
Commercial Proposal Nurlikon-962

JSC Uzbekistan Technological Metals Complex presents its compliments to your company and invites you to participate in the competitive selection process for the development of a Pre-Feasibility Study (PFS) for the project “Preparation for the Development of the Nurlikon Lithium Deposit,” including technological studies, in accordance with international standards.

When preparing your technical and commercial proposal, please take into account the following requirements. The proposal should include:

  • Project execution schedule;
  • Payment terms;
  • Proposal validity period (not less than 60 calendar days);
  • Description of relevant experience;
  • Compliance with the scope of work specified in the Terms of Reference;
  • Compliance with the requirements set out in the Terms of Reference.

Should your company be interested, kindly submit a technical and commercial proposal for the execution of the works in accordance with the attached Terms of Reference.

All required information should be sent by email to info@uztmk.uz and sh.gulyamov@uztmk.uz with the following subject line:

“Commercial Proposal Nurlikon-962”

The Terms of Reference are attached.

  • ico
    TERMS OF REFERENCE
    for the provision of services for technical support and preparation of the Preliminary Feasibility Study (PFS) for the project
    08.06.2026
Preparation of the detailed design for the project "Construction of production, warehouse, and administrative buildings and the 'Metals of the Future' technopark in the city of Akhangaran, Tashkent Region (Uzbekistan)."
Preparation of the detailed design for the project "Construction of production, warehouse, and administrative buildings and the 'Metals of the Future' technopark in the city of Akhangaran, Tashkent Region (Uzbekistan)."
29.07.2026
Preparation of the detailed design for the project "Construction of production, warehouse, and administrative buildings and the 'Metals of the Future' technopark in the city of Akhangaran, Tashkent Region (Uzbekistan)."
Topographic and geodetic survey works are planned to be carried out within the framework of the project “Preparation of the Miskon copper-porphyry deposit for industrial development” by JSC “Uzbekistan Technological Metals Combine.”
Topographic and geodetic survey works are planned to be carried out within the framework of the project “Preparation of the Miskon copper-porphyry deposit for industrial development” by JSC “Uzbekistan Technological Metals Combine.”
25.06.2026
Topographic and geodetic survey works are planned to be carried out within the framework of the project “Preparation of the Miskon copper-porphyry deposit for industrial development” by JSC “Uzbekistan Technological Metals Combine.”
Writing off fixed assets of “Uzbekistan Technological Metals Combine” JSC.
Writing off fixed assets of “Uzbekistan Technological Metals Combine” JSC.
08.07.2026
Writing off fixed assets of “Uzbekistan Technological Metals Combine” JSC.

Our partners

Useful links

Rate the website
Successfully sent
ico
Your participation helps us become even better. We are delighted to have you with us.
You have already submitted your rating
Please try again in a few days